Ongoing

CONSTRUCTION OF AN 18 INCH X 3.7 KM PIPELINE WORKS FROM CS MARKAZIYA TO CS JANUBIA SOUTH RUMAILA.

URL:

This project was Awarded to AKT Oil services company in April 2017.

The primary scope of the project to be undertaken is the replacement of the existing 3.7km x 24” carbon steel pipeline (stream 291) from Markazia to Janubia. This existing line shall be replaced by AKT with a new 3.7km x 18” pipeline which includes the construction of above ground piping works, cathodic protection design and installation works and installation of pigging facilities on the new pipeline.

The new pipeline installation scope to be undertaken by AKT includes all Engineering, construction, pre-commissioning and commissioning works, together with  all associated tie-ins and shortfall materials procurement.

The WORK shall consist of all activities required for the successful construction, pre-commissioning and commissioning of the new pipeline.