PIPELINE INSPECTION & REHABILITATION WORKS AT SHAMIAYA COMPRESSOR STATION.

URL:

This project site is located inside the Shamiaya compressor station.

Theproject involves;

  1. Excavating upstream of the receiver for the 30 inch CS Quarinat to CS Shamiaya pipeline exposing the 20 inch bypass line to the compressor station and terminating downstream the 40 inch launcher till the point where it ties-in with the 40 inch pipeline.
  2. Exposing both pipelines to company's (BGC) standard excavation procedure shoring the trench and straight edges where needed.
  3. Creating adequate work space in trench of at least 1 meter on the sides and 0.5 meter underneath of the exposed pipeline.
  4. Perform pipeline coating integrity inspection and assessment.
  5. Completely removing pipe coating or as directed by the inspection team on each of the exposed pipelines in its entire  length of approximately 100 meters each.
  6.  To adequately clean the de-coated pipeline surface using safe methods, sand blast and apply epoxy primer and new coating (BITUTAPE 165 PVC ANTI- CORROSION PIPE WRAPPING TAPE.) on the affected sections of the pipe.
  7. To back fill trench and reinstall site back to its original condition.

This project is 75% competed.