Completed

Hot Taping Services At BIN UMR Slugcatcher Station For Basrah Gas Company Iraq.

URL:

The project Bin UMR Hot taping project for Basrah Gas Company Iraq includes;

1. Procurement of 30" X 24" spilt Tee fitting for Hot Tapping on the BIN UMR 30 inch pipe section.

2. Procurement of 48" X 24" spilt Tee fitting for Hot Tapping on the Slug Catcher 48 inch pipe section.

3. Pipe integrity inspection, determination and preparation of hot tapping  location. 

4. Construction of a valve pit at the hot tap location on the 30 inch BIN UMR pipeline and concrete supports.

5. Construction of a 24 inch valve tie-in point on the 30 inch BIN UMR Gas pipeline using hot tapping technology.

6. Construction of a 24 inch valve tie-in point on the 48 inch Slug catcher facility using hot tapping technology.