Completed

Construction and pre-commission of 20”/6”/4” gas pipelines and piping, with a total length of 102km.

URL:

Brief Scope Of Work: Construction and pre-commission of 20”/6”/4” gas pipelines with a total length of 102km.

1.   This project includes transportation, stringing, bending, welding, Non Destructive Testing, trenching, lowering, backfilling and Pre-commissioning. Augur borings for road crossings and HDD for river crossings.

2.    Construction and installation of piping works for the launcher and receiver station at each end of the pipelines.

3.    Procurement and installation of fiber optic cables throughout the ROW of the pipelines.

4.    Installation of cathodic protection system for the entire pipe work, block valve station, launchers and receivers station.

5.    Construction of access roads, valve pits, warning signs, perimeter fence at all stations,

6.    Installation of power cables.

Client: Kuwait Energy Iraq Limited (KEIL)

Location: SIBA Oil and Gas Field /Basrah.

Duration: 11th Of July 2014 to 29th Of Feb 2016.