Completed

Construction of 48" pipeline total length 10.3 km.

URL:

Brief Scope Of work : Construction of seven 48" pipelines with a total length 10.3 km.
This includes
all civil and logistic works which includes; transportation, stringing, welding, Post welding heat treatment works, Non Destructive testing, and pre-commissioning.

The Pipeline works include Horizontal Directional Drilling works at river  crossings.

Also connection of  both ends of pipeline to concrete tanks.

Client: NSCC International.

Location:Shaat Al-arab /Basrah.

Duration: 27 Of July 2012  to 4th Of May 2013.