Completed

Construction of 6’’ and 8’’ flowlines, total length 52km.

URL:

Brief Scope Of Work: Construction of  6’’ and 8’’ flow line and all adjoining construction, Civil and logistic works which includes; transportation, stringing, welding, Non Destructive testing, and pre-commissioning. Install above ground flow lines on concrete slippers.

Scope also includes connection of these lines to end facilities at well head and at the degassing station (DS)on the other end.

 

Client: China Petroleum Pipeline (CPP)

Location:Rumaila Oil Field/ Basrah

Duration: 23rd of March 2013 to 26thof October 2014.