Completed

Construction of 48" pipeline total length 9 kilometers.

URL:

Brief Scope Of Work: Construction of 48 inches pipeline 9 kilometers in length. This project includes transportation, stringing, bending, welding, Non Destructive Testing, trenching, lowering, backfilling and Pre-commissioning.

Client: SCOP / China Petroleum Pipeline (CPP)

Location: Rumaila Oil Field/ Basrah Iraq.

Duration: 13th August 2013 to 19th October 2014.